| PROJECT | CLIENT | SERVICES |
| 1600 MW Combined Cycle Power Station Multi-shaft Dual Fuel Zero Discharge Permit Boston, MA | EPC Contractor | Claim Evaluation Claim Preparation |
| 1200 MW Combined Cycle Power Station Single-shaft Dual Fuel Hull, Great Britain | EPC Contractor | Claim Evaluation Claim Preparation |
| 115 MW Power Simple Cycle Power Plant Kuwait | Turnkey Contractor | Schedule Analysis Claim Preparation |
| 1200MW Coal Power Station Jorf Lasfar, Morrocco | EPC Contractor | Claim Evaluation |
| 1200 MW PC Power Station Indonesia | Boiler Supplier and Erector | Claim Avoidance Subcontractor Claim Management |
| 3500 MW PC Power Station South Africa | Boiler Supplier and Erector | Schedule Analysis Claim Analysis Claim Defense |
| Acid Gas Removal System Public Utility New York | Original Equipment Manufacturer | Claim Preparation |
| Electrostatic Precipitator Rebuild Public Utility New England | Constructor | Claim Preparation |
| Utility Coal Fired Boiler Low NOx Conversion Maryland | Outage Contractor | Claim Preparation |
| 1800MW PC Power Station China | Boiler Supplier and Erector | Claim Analysis and Defense Mediation Support |
21.5MW Wood Fired BFB Cogeneration Project Alberta, Canada | EPC Contractor | Claim Analysis Claim Preparation Expert Testimony |
90MW Heavy F.O. Power Station El Salvador | EPC Contractor | Claim Preparation Claim Evaluation Expert Testimony |